Tempered Water Supply for Jobo

A place to talk about photography, the meaning of life and anything that doesn't quite fit elsewhere
Post Reply
timparkin
Forum Hero
Posts: 472
Joined: Tue Aug 21, 2007 1:40 pm Etc/GMT-1+01:00
Location: Leeds, West Yorkshire
Contact:

Tempered Water Supply for Jobo

Post by timparkin » Mon Jun 21, 2010 3:17 pm Etc/GMT-1+01:00

Just a quick question. I have a Jobo mixing panel for my new ATL and am having a problem finding out how it works..

I'm also getting cold water feeding back into the hot water supply (gravity fed hot water) and am wondering if I need a check valve and what type of check valve? (the Jobo has a valve on the incoming cold side which is adjustable with a screwdriver but I'm presuming this is just a pressure regulator rather). I've ordered a simple check valve and a pressure regulator which I'm hoping will fix things..

I'm wondering if you are supposed to have the drain flowing during operation of the machine (in order to ensure a constant temperature flow)?

A colleague is also asking about whether he needs a tempered water supply for an ATL1500 (I'm presuming they can work from just a cold supply?)

Tim





Image

Image
Waiting for the developing bill - 2 hours (and it's so small now!)

DJ
Site Admin
Posts: 360
Joined: Thu Sep 07, 2006 1:48 pm Etc/GMT-1+01:00
Location: Norfolk

Re: Tempered Water Supply for Jobo

Post by DJ » Mon Jun 21, 2010 5:12 pm Etc/GMT-1+01:00

Well now that's just showing off... :wink:

timparkin
Forum Hero
Posts: 472
Joined: Tue Aug 21, 2007 1:40 pm Etc/GMT-1+01:00
Location: Leeds, West Yorkshire
Contact:

Re: Tempered Water Supply for Jobo

Post by timparkin » Tue Jun 22, 2010 9:42 am Etc/GMT-1+01:00

Not intended but I can see what you mean :-) I am quite happy with how it's all gone in (apart from the buckets of water coming through the ceiling)..

Picked up a Howtek Scanmaster 4500 yesterday too - looking forward to getting the whole workflow working smoothly...
Waiting for the developing bill - 2 hours (and it's so small now!)

Tom Kershaw
Posts: 12
Joined: Tue Jul 28, 2009 6:33 pm Etc/GMT-1+01:00
Location: South Norfolk, United Kingdom
Contact:

Re: Tempered Water Supply for Jobo

Post by Tom Kershaw » Wed Jun 23, 2010 10:56 am Etc/GMT-1+01:00

Tim,

In the Jobo ATL-2x00 series machines, the tempered supply is used for warm water that gets pumped into the film developing tank (e.g. E6 film washing). The water bath is kept at temperature by an internal 1000W heater, i.e. starts off cold and gradually reaches the correct process temperature.

Tom

Patrick Dixon
Forum Hero
Posts: 252
Joined: Thu Apr 09, 2009 4:20 pm Etc/GMT-1+01:00
Location: Yate

Re: Tempered Water Supply for Jobo

Post by Patrick Dixon » Wed Jun 23, 2010 12:29 pm Etc/GMT-1+01:00

I'm pretty sure you're missing a big dial with a red zone and the word 'DANGER' there, Tim.

timparkin
Forum Hero
Posts: 472
Joined: Tue Aug 21, 2007 1:40 pm Etc/GMT-1+01:00
Location: Leeds, West Yorkshire
Contact:

Re: Tempered Water Supply for Jobo

Post by timparkin » Wed Jun 23, 2010 1:02 pm Etc/GMT-1+01:00

Patrick Dixon wrote:I'm pretty sure you're missing a big dial with a red zone and the word 'DANGER' there, Tim.
heh! :-)
Waiting for the developing bill - 2 hours (and it's so small now!)

timparkin
Forum Hero
Posts: 472
Joined: Tue Aug 21, 2007 1:40 pm Etc/GMT-1+01:00
Location: Leeds, West Yorkshire
Contact:

Re: Tempered Water Supply for Jobo

Post by timparkin » Wed Jun 23, 2010 1:09 pm Etc/GMT-1+01:00

Tom Kershaw wrote:Tim,

In the Jobo ATL-2x00 series machines, the tempered supply is used for warm water that gets pumped into the film developing tank (e.g. E6 film washing). The water bath is kept at temperature by an internal 1000W heater, i.e. starts off cold and gradually reaches the correct process temperature.

Tom
Thanks Tom!

I'll let you know what happens once I plumb in my check valve and pressure regulator..

Tim
Waiting for the developing bill - 2 hours (and it's so small now!)

Tom Kershaw
Posts: 12
Joined: Tue Jul 28, 2009 6:33 pm Etc/GMT-1+01:00
Location: South Norfolk, United Kingdom
Contact:

Re: Tempered Water Supply for Jobo

Post by Tom Kershaw » Wed Jun 23, 2010 4:59 pm Etc/GMT-1+01:00

Tim,

You need to make sure that water is pumped through to the raised trough situated below the film development tank. This pumping action is performed by the external motor on the rear of the machine. My ATL-2300 uses an external 12V supply for the motor as the Jobo electronics in my machine don't power the motor due to a fault.

Tom

Post Reply